Опубликован график планового отключения горячего водоснабжения в Витебске на 2024 год

Miory Regional Executive Committee

Starting May 15, the branch "Vitebsk Heat Networks" of the State Unitary Enterprise "Vitebskenergo" will begin conducting tests at elevated temperatures, assessing heat and hydraulic losses of heat networks, and carrying out repair and preventive works on the heat networks of the regional center.

The objective of the upcoming works is preparation for the autumn-winter period of 2024-2025. In this regard, a scheduled hot water shutdown will commence in Vitebsk.

Phased schedule for hot water shutdown in Vitebsk

Mini-CHP "Vostochnaya"

from May 15 to May 27

Boiler House "Yuzhnaya", Stage I

from June 3 to June 15

Vitebsk CHP

from July 23 to August 4

Boiler House "Yuzhnaya", Stage II

from August 12 to August 24

Boiler House "Severnaya"

from August 19 to August 31

From May 15 to May 27 – Mini-CHP "Vostochnaya"

From 9.00 on May 15, 2024 to 23:59 on May 27, 2024, scheduled repair work will be carried out on heat networks supplied by Mini-CHP "Vostochnaya". In connection with this, hot water supply will be unavailable in residential buildings and other facilities located at the following addresses:

- Suvorova St.;

- Kupaly St.;

- Krylova St.;

- Mayakovsky St.;

- Politekhnicheskaya St.;

- Sovetskaya St.;

- Baumana St.;

- Lenina St., 36, 40, 44/2, 46/1, 48, 50/6, 52/13, 52, 52a, 52b, 53, 54, 55, 55a, 56, 57, 58, 59/11, 60, 61, 62/19, 63, 64, 65, 66, 65a, 67/21, 68, 69,70, 71, 72, 73/2, 74, 75, 76;

- Tolstogo St., 1, 3, 5;

- Kotovskogo St., 15, 17, 21, 23;

- 5th Frunze St., 2, 6, 14;

- 2nd Frunze St., 4;

- all facilities on Pravdy St. (except buildings No. 13/7, 14/5, 18 and 24);

- Lyudnikova Ave., 11, 11a, 12, 13, 14, 15, 16, 17;

- Moskovsky Ave., 66/1, 68, 70, all facilities of the technological university, 74 Bldg. 1, 74 Bldg. 2, 74 Bldg. 3, 74 Bldg. 4, 74 Bldg. 5, 74 Bldg. 6; 74a, 76, 78, 80, 82, 84, 80a (Kindergarten No. 89), 106;

- Frunze Ave. (except 11, 13a, 13, 13a/1);

- Smolenskaya St. (except railway No. 4 Bldg. 1, 4 Bldg. 2, 4 Bldg. 3, 4 Bldg. 4, 4 Bldg. 5, 4 Bldg. 6);

- all facilities on Tereschkova St., Krasnoflotskaya St., Poperrechnaya St., Lugovaya St., Berestenya St., Lazo St., Narodnaya St., Mira St., Chapaeva St., 26 June St., Dovatara St., Uritskogo St., Deputatskaya St., Putna St., Komunisticheskaya St., Chekhova St., Kutuzova St., Kuibyshev Ave., Griboyedova St., Horovetsa St.;

- 2nd Sadovaya St., 6, 8, 10/3, 9, 11, 13, 13a, 15;

- 3rd Sadovaya St., 10;

- 6th Klinicheskaya St., 44;

- Klinichesky Lane, 3, 5;

- Aviatsionny Lane, 2;

- industrial facilities on S. Pankova Passage;

- Tulovo settlement, Central St., Novosyolov St., Molodezhnaya St., Yubileynaya St., Sadovy Lane;

- Cheryomushki microdistrict;

- Bilevo microdistrict.

From 9:00 on 17.05.2024 to 23:59 on 18.05.2024, hydraulic pressure testing of heating networks will be carried out.

From June 3 to June 15 – “Yuzhnaya” boiler house, Stage 1

From 9:00 on 03.06.2024 to 23:59 on 15.06.2024, repair work on heating networks from the “Yuzhnaya” boiler house (Stage 1) will be carried out. In connection with this, hot water supply will be unavailable at the following facilities:

- Moskovsky Ave., 29;

- all facilities on V. Internatsionalistov St.;

- all facilities on Meditsinskaya St.;

- Gen. Margelova St., 1;

- Stroiteley Ave., 1; 1a; 2; 3 Bldg. 1, 3 Bldg. 2, 3 Bldg. 3; 3b; 5 Bldg. 1, 5 Bldg. 2; 5a (Kindergarten No. 106); 6; 7; 7 Bldg. 1, 7 Bldg. 2, 7 Bldg. 3; 8; 8 Bldg. 2; 11; 11a; 15; 23 (“Ice Palace”);

- VGMU Clinic;

- “Lyuchesa” Hotel;

- P. Brovki St., 15; 15 bldg. 1, 15 bldg. 2, 15 bldg. 3, 15 bldg. 4, 15 bldg. 6; 17 bldg. 1, 17 bldg. 2, 17 bldg. 3, 17 bldg. 4; 19 bldg. 1, 19 bldg. 2, 19 bldg. 3, 19 bldg. 4; 21 bldg. 1, 21 bldg. 2, 21 bldg. 3; 23 bldg. 1, 23 bldg. 2; 25; 39; 37;

- facilities of the oncology dispensary, nephrology building, regional hospital, children's home, maternity hospital No. 2, District Sanitary-Epidemiological Station;

- Pobedy Ave., 15 bldg. 1, 15 bldg. 4; 17; 17a; 19; 19a (Kindergarten No. 100); 21; 21 bldg. 1, 21 bldg. 2, 21 bldg. 3, 21 bldg. 4, 21 bldg. 5; 23; 23a (Kindergarten No. 102); 23d; 25 bldg. 2, 25 bldg. 3; 25a (Kindergarten No. 103); 27; 27 bldg. 1, 27 bldg. 2; 29; 29 bldg. 2, 29 bldg. 3, 29 bldg. 4, 29 bldg. 5; 29a (Secondary School No. 39); 31; 31 bldg. 1, 31 bldg. 2; 33; 35; 37; 37 bldg. 1; 41; 41 bldg. 1; 43; 43 bldg. 1; 45; 45 bldg. 1; 47; 49; 53; 55; 55 bldg. 1, 55 bldg. 2, 55 bldg. 3, 55 bldg. 4; 57; 57 bldg. 1; 59; 59 bldg. 1, 59 bldg. 2, 59 bldg. 3; 61; 61 bldg. 1, 61 bldg. 2;

                                                                                                                                                                                                                                                          &......

- st. Chernyakhovsky, 14 bldg. 5 (Secondary School No. 33); 23; 25; 25a (Hotel Vetraz); 27; 27a; 27 bldg. 1; 29; 31 bldg. 5; 32; 31 bldg. 2 block: A, B, C, D; 32 bldg. 1, 32 bldg. 2, 32 bldg. 3; 33; 34a; 34/13; 34; 34c; 34 bldg. 1; 34 bldg. 2, 34 bldg. 3, 34 bldg. 4; 35 bldg. 1; 36; 36 bldg. 1, 36 bldg. 2; 38; 42; 44.

During the period from 09:00 on 03.06.2024 to 23:59 on 04.06.2024, hydraulic pressure testing of heating networks will be carried out.

From July 23 to August 04 – Vitebsk CHP

From 09:00 on 23.07.2024 to 23:59 on 04.08.2024, scheduled maintenance of heating networks from Vitebsk CHP will be carried out. In connection with this, hot water supply will be unavailable at the following facilities:

all facilities in the area of st. 39th Army, Akademika Pavlova, Belinskogo, Bebelya, Beloborodova, Budyonnogo, Bumagina, Byaduli, B. Khmelnytskogo, 2, 3, 4/16, 5/14 ("Belsoyuzpechat"), 7/13, 10 (Department of Justice, Employment Center), st. Vostretsova, Vitebskoy, Voykova, Gertsena, Gorodokskoy, Gorbachevskogo, M. Gorkogo, Goncharnoy, Gogolya, Glinki, Grazhdanskoy, Dobrolyubova, Dimitrova, Evstigneeva, Zhoresa, Zamkovoy, Zenkovoy, Zolotogorskoy, Kalinina, Kosmonavtov, Kirova, Kol'tsova, Komsomolskoy, 5th Kooperativnaya, Krasina, Kondrat'eva, Lomonosova, Lokomotivnoy, Leonova, K. Marksa, Michurina, Myasnikova, Naberezhnykh, Novyy Byt, Nekrasova, Oktyabrskoy, Ordzhonikidze, Porokhovoy, Pokrovskoy, Pushkina, Proletarskikh, Pryadil'noy, Repina, Revolyutsionnoy, Rozy Lyuksamburg, Sotsialisticheskikh, Smetanina, Sovetskoy Armii, Sverdlova, Stakhanovskiy per., Stroitel'nyy per., Il'yinskogo, 4th Industrial'naya, Shagala, Shirokoy, Engel'sa, Energetikov per., st. 4th Chkalova, Yamskoy, Pobedy Sq., Svobody Sq.;

- st. Lenina, 6, 8, 8a, 10, 12, 14, 16, 16/22, 16/7, 17, 18, 19, 20, 23, 24, 26/2, 26a, 28, 30/21, 32, 33a, 35,

- st. Leningradskaya, 2, 4, 15, 16, 17, 18, 27, 37, 39;

- st. Pravdy, 3, 5, 7a, 8a, 18, 18 bldg. 1, 24;

- st. Titova, 12, 12a, 14, 16, 20, 20a, 20 bldg. 1, 20 bldg. 1a, 22, 24;

- Chernyakhovsky Ave., 5, 7, 9, 11, 13, 13a, 14, 14a, 15, 16, 17, 17a, 18, 19, 20, 20 bldg. 3, 22;

- Frunze Ave., 11, 13a, 13, 13a/1;

- Kirovsky settlement.

From 09:00 on 23.07.2024 to 23:59 on 25.07.2024, hydraulic testing of heating networks at elevated pressure will be carried out.

From August 12 to 24 – Southern Boiler House, Stage 2

From 09:00 on 12.08.2024 to 23:59 on 24.08.2024, repair work on the heating pipeline from the Southern Boiler House (Stage II) will be carried out. As a result, hot water supply will be unavailable at the following locations:

- Moskovsky Ave., 7; 7 bldg. 2; 8; 8a; 9a; 9b; 9 bldg. 1, 9 bldg.2; 10; 11 bldg. 1, 11 bldg. 2, 11 bldg. 3, 11 bldg. 4, 11 bldg. 5; 12; 13 bldg. 1, 13 bldg. 2, 13 bldg. 3, 13 bldg. 4, 13 bldg. 5, 13 bldg. 6 (Kindergarten No. 78); 14; 15; 15a; 16; 17/1; 18; 19 bldg. 1, 19 bldg. 2; 19/2 bldg. 1; 20; 20a; 20b; 21a; 21 bldg. 2, 21 bldg. 3, 21 bldg. 4; 22; 22a (bathhouse); 23; 24; 25; 26; 26 bldg. 1; 27; 27 bldg. 1, 27 bldg. 2; 28; 28a (Secondary School No. 11); 29 bldg. 2; 30; 31;31a; 32; 32a; 33 (University); 34; 35; 35a (Kindergarten No. 96); 36; 36bldg.1; 37; 38; 39; 39 bldg. 1, 39 bldg. 3; 40; 41; 41a (Gymnasium No. 9); 42; 43; 43a (Polyclinic); 43bldg. 1; 44; 45; 45a (Secondary School No. 38); 45b; 45 bldg. 1, 45 bldg. 2; 46; 47; 47 bldg. 1, 47 bldg. 2; 48; 49; 49a; 50; 51a; 51; 52; 53; 54; 55; 56; 57; 57b; 59; 59a; 59b; 58; 60 ("Euroopt"); 62; 62 bldg. 1; 64; 64a; 66; 86 ("Santa" store);

- Smolenskaya St., 4, bldg. 1; 4 bldg. 2; 4 bldg. 3; 4 bldg. 4; 4 bldg. 5, 4 bldg. 6;

- Stroiteley Ave., 4; 6; 8 bldg. 1; 8 bldg.3; 10; 12; 12 bldg. 1; 16, 18a (Kindergarten No. 85); 18 bldg. 1, 18 bldg. 2, 18 bldg. 3, 18 bldg. 4; 20 bldg. 1, 20 bldg. 2, 20 bldg. 3; 22 bldg. 1, 22 bldg. 2, 22 bldg. 3, 22 bldg. 4, 22 bldg. 5, 22 bldg. 6, 22 bldg. 7; 24 bldg. 1, 24 bldg. 2, 24 bldg. 3, 24 bldg. 4, 24 bldg. 5, 24 bldg. 5a; 26/13;

- P. Brovki St., 1a (Kindergarten No. 93); 1 Bldg. 1; 3a; 3 Bldg. 1, 3 Bldg. 2; 5a; 5b (Kindergarten No. 2); 5 Bldg. 1; 7 Bldg. 1, 7 Bldg. 2, 7 Bldg. 3, 7 Bldg. 4 (Secondary School No. 12), 7 Bldg. 5; 9 Bldg. 1, 9 Bldg. 2, 9 Bldg. 3; 11a (Kindergarten No. 88); 11 Bldg. 1, 11 Bldg. 2, 11 Bldg. 3; 13a; 15 Bldg. 5, 16a; 16; 17; 17a; 19; 18; 20a; 20; 21; 22; 23; 23a (Secondary School No. 42); 32; 32a; all facilities of JSC "Vityaz";

- Pobedy Ave., 1; 2; 3; 3a (Kindergarten No. 52); 3b; 3g; 3 Bldg. 1; 3 Bldg. 2; 3 Bldg. 3; 4a (Kindergarten No. 95); 4; 5; 5 Bldg. 1; 5 Bldg. 2; 6; 6 Bldg. 1, 6 Bldg. 2; 7; 7 Bldg. 1;7 Bldg. 2; 8; 8a; 10; 12;

- Chkalova St., 1; 1/17; 2; 3; 4 Bldg. 2; 5; 6; 7; 7 Bldg.1; 7 Bldg. 2, 8; 10; 11/14 (Kindergarten No. 84); 12; 14; 14 Bldg. 1; 14 Bldg. 2; 9 Bldg. 1, 9 Bldg. 2, 9 Bldg. 3, 9 Bldg. 4, 9 Bldg. 5, 9 Bldg. 6, 9 Bldg. 7, 9 Bldg. 8, 9 Bldg. 9; 11a; 11 Bldg. 1, 11 Bldg. 1a, 11 Bldg. 2, 11 Bldg. 3, 11 Bldg. 3a (Kindergarten No. 16), 11 Bldg. 4, 11 Bldg. 7, 11 Bldg. 8, 11 Bldg. 9; 13; 14a (Kindergarten No. 18); 14v (Children's Polyclinic); 15; 16; 16 Bldg. 2; 17; 17 Bldg.1; 17/2; 18; 18 Bldg. 1; 18 Bldg. 2; 18 Bldg.3; 18a ("Vesta" 139); 19a (Gymnasium No. 5);19 Bldg. 1, 19 Bldg. 2, 19 Bldg. 3, 19 Bldg. 4; 22 (Secondary School No. 25); 24a (Bowling Center); 24 Bldg. 1; 24 Bldg. 2; 24 Bldg. 3; 24 Bldg. 4; 24 Bldg. 5; 24 Bldg. 6; 24 Bldg. 7.

- Starobabynovichsky Trakt, 2; 4;

- 2-y Prodol'naya St., 3;

- Lenina St., 1/8; 1a; 3; 3a; 3b; 5a; 5/1; 11v; 15/9;

- Ofitserskaya St., 2;

- Chernyakhovskogo Ave., 1; 3; 4; 5; 6; 6 Bldg. 1, 6 Bldg. 2, 6 Bldg. 3, 6 Bldg. 4, 6 Bldg. 5, 6 Bldg. 6; 7; 8; 8a; 10; 12; 18a (Kindergarten No. 6); 20 Bldg. 4; 20 Bldg. 5; 20 Bldg. 6; 20 Bldg. 7; 22 Bldg.2; 22 Bldg. 3; 22 Bldg. 4; 22 Bldg.5; 22 Bldg. 6; 22 Bldg. 7; 24; 24d; 24 Bldg. 2; 26; 26 Bldg. 1; 26 Bldg. 2; 26 Bldg. 3; 26 Bldg. 4; 26 Bldg. 5;

- Zhestkova St., 7; 8/1; 10a; 11; 11a; 12; 13; 14; 14a; 15; 16; 16a; 17; 18; 18a, 19; 20; 21; 21a; 22; 23; 24; 25;

- Shradera St., 1; 3; 3 Bldg. 1; 6; 7; 8; 10; 12; 14;

- Shubina St., 2; 3; 4; 5/13;

- Khmel'nitskogo St., 9; 9a; 11/6; 12; 20; 24; 27a; 29 (Kindergarten No. 36); 30; 31;

- 3-y Kollektivnaya St., 6.

During the period from 9:00 on 12.08.2024 to 23:59 on 13.08.2024, hydrostatic testing of heating networks under increased pressure will be conducted.

From August 19 to 31 – the "Severnaya" boiler house

Starting from the 9th, planned maintenance of the heating networks from the "Severnaya" boiler house will be carried out. In connection with this, hot water supply will be unavailable at the following facilities:

in the area of Gagarina, Keramzitovaya, Serova, Skoriny, Babushkina, Osipenko, 7-ya Surazhskaya streets, 3-ya Sadovaya, 24, 26, 30, 2-ya Sadovaya, 2, 4-ya Sadovaya, 1-ya and 2-ya Polyarnaya, 1-go Sovkhoznogo pereulka, Lyudnikova Avenue, 2 (Secondary School No. 3), 4, 10.

During the period from 9:00 on 20.08.2024 to 23:59 on 21.08.2024, hydrostatic testing of heating networks under increased pressure will be conducted.

Owners of heat consumption systems are required to carry out major repairs of heating networks, heating substations, and internal heating systems, including flushing and pressure testing of pipelines.

Heat consumption systems that have not undergone major repairs and preparation of equipment for the 2024–2025 heating season will not be permitted to operate.

During the days of heating network testing, pipeline damage cannot be ruled out, which may lead to substantial leakage of system water. During this period, we ask you to remove all valuables from basement premises.

If damage to heating networks is detected, please report it immediately by phone at 67-04-41, 67-04-14, 67-06-47.